It is planned to make the hole needle "from the ground up" for the first time at GBV.The first welcome should have basic start date to the 26.10. 4 Faufen are planned.If you could please tell the post size on occasion me.Also, I would ask them to arrange that the required material at KG is ordered.
đang được dịch, vui lòng đợi..